Oil & Gas
Onshore/Offshore Power Generation
30MW Class
| Gas Turbine | CGT25-E | CGT30-E | SGT-600 | SGT-700 | 
| Power output, MW | 25.5 | 32.93 | 24.5 | 35.2/32.8 | 
| Efficiency, % | 35.42 | 38.63 | 33.6 | 38.0/37.2 | 
| Fuel type | Natural gas/Liquid fuel/Dual fuel | Natural gas/Liquid fuel/Dual fuel | Natural gas/Liquid fuel/Dual fuel | Natural gas/Liquid fuel/Dual fuel | 
| Exhaust temperature, ℃ | 480 | 497 | 543 | 531/533 | 
| Exhaust flow, kg/s | 90 | 104 | 81.3 | 98.7/95.0 | 
| Generator speed, rpm | 3000 | 3000 | 1500 | 1500 | 
 
All performance values are based on ISO ambient conditions and natural gas fuel.
Gas Turbine Generator Units for Penglai 19-3/19-9 Oil Field, CNOOC
- 
- 2 x CGT25-EA Dual Fuel Gas Turbine Generator Units. 
 
- China’s first domestic Gas Turbine Generator units applicable to the offshore platform, certified by CCS and with independent intellectual property rights. 
- Breakthroughs multiple key technologies such as dual fuel combustion technology, low-emission combustion and fast switch online, full authority digital control of dual fuel units, offshore fixed/floating platform adaptability, etc. 
- The first batch of gas turbine innovation demonstration projects, and finished the industrial 4,000-hour continuous operation test and passed the acceptance organized by the Energy Bureau in September 2020. 
Gas Turbine Generator Units for Dongfang 13-2 Gas Field, CNOOC
- 
- 3 x SGT-600 Dual Fuel Gas Turbine Generator Units. 
 
- Localized package design and supply of whole Gas Turbine Generator set for offshore platform, achieved China’s first offshore application of SGT-600 gas turbine. 
- Put into operation in March 2019, accumulated more than 73,000 equivalent operation hours by the end of October 2023. 
Gas Turbine Generator Units for Caofeidian 11-1/11-6 Oil Field, CNOOC
- 
- 3 x SGT-700 Dual Fuel Gas Turbine Generator Units. 
 
- Localized package design and supply of whole Gas Turbine Generator set for offshore platform, achieved the world’s first offshore application of SGT-700 gas turbine generator unit. 
- Put into operation in October 2019, accumulated more than 53,000 equivalent operation hours by the end of October 2023. 