Oil & Gas

Onshore/Offshore Power Generation

6MW Class

Gas Turbine SGT-100 UGT6000
Power output, MW 5.1/5.4 6.2
Efficiency, % 30.1/30.2 30.2
Fuel type Natural gas/Liquid fuel/Dual fuel Natural gas
Exhaust temperature, ℃ 544/549 430
Exhaust flow, kg/s 19.5/21.0 30.98
Generator speed, rpm 17384 1500

All performance values are based on ISO ambient conditions and natural gas fuel.

Gas Turbine Generator Unit for Dongfang Terminal, CNOOC

  • 1 x UGT6000 Gas Turbine Generator Unit.

  • The first gas turbine generator unit supplied to Oil & Gas field with localized package design and performance guarantee in China.

  • Continuous trouble-free operation time of more than 34,000 EOH, with a cumulative operating time of nearly 108,000 EOH by the end of October 2023.

  • Full life cycle services such as operation and maintenance support, technical services, and overhaul of core engine have been fully localized and provided by GH Turbine.

EPC of Gas Turbine Generator project for Weizhou Terminal, CNOOC

  • 2 x UGT6000 Gas Turbine Generator Unit.

  • Annual operation of more than 8,000 hours, with a cumulative operating time of more than 106,000 EOH by the end of October 2023.

  • Efficient localization of full life cycle services provided by GH Turbine to ensure the reliable operation of the units.

Onshore/Offshore Power Generation

  • 6MW Class

  • 8MW Class

  • 15MW Class

  • 30MW Class

  • 40MW Class